DOWNLOADS

divider

Geotopics 2017/18: Read about the range of projects we have worked on in our annual magazine. This year's edition includes:

  • A site investigation between junctions 13 and 16 of the M1 as part of a £349 million investment
  • Our chairman Len Threadgold's recent award for excellence in geotechnical practice from the ICE and the British Geotechnical Association
  • Investigations in Peterborough and Leeds on live Network Rail facilities
  • Working on track throughout Phases 4 and 5 of the North West Electrification Project (NWEP)
  • Investigating the ground at the University of Manchester for the £150m Henry Royce Institute
  • Working with the Environment Agency in Hampshire

Rail Capability Brochure: Discover what we can do for your rail project, including a case study from our work on Crossrail.

Barrow - Long Sewer Outfall Investigation: With our Hägglund Cable Percussion rig, we conducted a site investigation for United Utilities in preparation for a new sewer outfall structure. Read this case study to find out how we handled the logistical challenges of working in an environmentally sensitive area with rapid tides.

Hägglund Rig Specification Sheet: Get the full lowdown on the all-terrain Hägglund BV 206 rig we used on our investigation at Barrow.

Invasive Species Handbook: A GO SAFE guide on how to manage Giant Hogweed, Japanese Knotweed and Himalayan Balsam on site