Bincombe Shaft
Currently under construction, the Weymouth Relief Road passes over a Victorian railway tunnel access shaft which extends vertically down to an active railway tunnel lying some 40m below the current ground level. Investigation was required to determine its location and backfill characteristics and hence to provide parameters for designing a shaft cap.
